Terms
& Warranty

A legal disclaimer

1. Payment Schedule

 

All projects are subject to the following payment structure unless otherwise stated in writing:

 

  • 50% deposit due prior to commencement of work

  • 50% payment due upon 50% completion of the project

  • Remaining balance due immediately upon completion and prior to final handover

​

For large-scale projects, payments shall be made in quarterly progress payments, meaning:

 

  • Payment is due at each major stage or quarter of work completed

  • Failure to make scheduled payments will result in immediate suspension of work

  • The Builder reserves the right to delay or terminate the project until payment is received

​

No work will continue without required payments.

​

2. Non-Payment & Builder Rights

 

If payment is not made:

 

  • The Builder reserves the legal right to suspend work immediately

  • The Builder may remove crews and equipment from site

  • The Builder is entitled to file a construction lien against the property

  • The Owner will be responsible for all legal costs, collection costs, and interest

​

 

3. Project Completion Requirement

​

All projects must be completed in full.

 

  • Customers cannot stop or cancel a project midway once work has begun

  • Partial completion is not permitted unless approved in writing

  • The Builder must be allowed to complete the project as contracted

 

​

4. Site Access & Safety

​

For safety and liability reasons:

 

  • Customers are not permitted on the job site during construction

  • Entry is prohibited until the project is 100% completed and handed over

  • The structure cannot be used prior to completion

  • This includes:

    • Garages under construction

    • Concrete pads curing

    • Suites being built

    • Any unfinished structural area

  • Unauthorized site entry is at the Owner’s own risk and voids warranty obligations.

 

5. Concrete Warranty Coverage

 

The Builder provides a limited one (1) year warranty from the date of project completion covering:

​

Covered:

  • Major structural defects caused by workmanship

  • Large structural cracks affecting integrity of the slab or structure

​

Not Covered:

  • Hairline cracks (normal concrete shrinkage)

  • Minor surface cracks

  • Discoloration or natural weathering

  • Salt damage, freeze/thaw damage, or environmental conditions

  • Improper use, overloading, or misuse

  • Settlement caused by soil conditions beyond Builder control

​

Concrete naturally expands, contracts, and may crack. Minor cracking is normal and not a defect.

​

6. Structural Construction Warranty

​

For garages, suites, and structures:

 

  • Builder warrants workmanship for one (1) year

  • Warranty applies only to defects caused directly by Builder workmanship

  • Does not cover:

    • Normal settling

    • Material manufacturer defects

    • Weather damage

    • Owner alterations or misuse

​

7. Warranty Claim Process

  • Claims must be submitted in writing within the warranty period

  • Builder must be given reasonable time to inspect and repair

  • Builder reserves the right to determine the appropriate repair method

 

8. Pre-Construction Agreement Requirement

​

Warranty terms, payment terms, and project scope:

 

  • Will be provided before work begins

  • Must be reviewed and signed by the Owner

  • Work will not commence until agreement is signed